ARCHITECTURE BUILDING EXPANSION / CALA EAST |
|
|
|
Description: This addition will provide a centralized location for collaborative architecture and landscape architecture studios, along with expanding studio space, east along Speedway in a three-story addition connected to the existing Architecture Building. An addition of approximately 33,500 sq.ft. will be added. A materials lab will also be developed on the first floor of the addition to meet the changing demands of the educational program. |
|
Project Number |
00-8158 |
|
Phase |
|
|
Project Links
Sustainability Highlights
|
|
Delivery Method |
CMR |
|
Projected Budget |
$9,400,000
[learn more] |
|
Size |
33020 gross sq. ft.
25700 net sq. ft.
|
|
Construction Schedule |
October 2005 - February 2007 |
|
Building Number(s) |
|
|
|
PDC Design Manager |
Johnson, Debra
|
|
|
PDC Construction Manager |
Marsh, Rick |
|
|
Architech/Engineer |
Jones Studio Inc
|
|
|
Contractor |
Lloyd Construction Co Inc
|
|
|
CM |
Lloyd Construction Co Inc
|
|
|
|
|
|
|
|